Research Article

Seismic Performance Assessment of a Multistorey Building Designed with an Alternative Capacity Design Approach

Table 2

Time-based loss assessment analyses results referred to 1 year. Difference is obtained as subtraction between the single-q approach value and variable-q approach value.

Performance measureSingle-q approachVariable-q approachDifference (percentage)

Number of fatalities0.240.14+0.10 (+41.6%)
Number of injured people0.600.34+0.26 (+43.3%)
Total repair cost ($)72 748.063 769.0+8 979.0 (+12.3%)
Total repair time (days)5.364.78+0.58 (+10.8%)