Research Article
Field Measurement and Numerical Modelling Study on Mining-Induced Subsidence in a Typical Underground Mining Area of Northwestern China
Table 1
Detailed information about the monitoring lines.
| Line name | Length (m) | Point no. | Monitoring period | Note |
| Line N | 1270 | N01–N45 | 11/21/2017–10/24/2018 | In the middle of 31102 panel along strike across the setup room | Line A | 1670 | AK1–AK3 and A1–A61 | 7/27/2019–7/5/2020 | In the middle of 31103 panel along strike across the setup room | Line Q | 2276 | KQ1–KQ3, Q1–Q23, Z33, Q25–Q48, W1–W20, and K1–K3 | 11/21/2017–7/3/2020 | Along the dip of 31102 and 31103 panels near the setup room |
|
|