CK structure quantities.

5 floors10 floors15 floors
200720182007201820072018

BS30 concrete, m³2685.52685.5384078.84078.85468.15468.1
Concrete formwork, m213031.213031.2423771.923771.934512.634512.6
Base slab142.4142.4142.4142.4142.4142.4
Shear wall1347.61347.61347.61347.61347.61347.6
Flooring727.5727.5727.5727.5727.5727.5
Beam73.173.173.173.173.173.1
S420C reinforcement (thin), kg88942.589128.6162696.7158846.7233322.5227751.9
S420C reinforcement (thick), kg93645.193588.3124044.7121041.5152553.7143601.0
S420C reinforcement (total), kg182587.6182716.93286741.4279888.2385876.2371352.9
Total reinforcement difference, %+0.07%−2.45%−3.91%