Research Article

Optimal Reservoir of Small Reservoirs by Optimization Techniques on Reservoir Simulation Model

Table 1

Situations of water shortage and excess release of the Huay Ling Jone reservoir using historic inflow of 24 years.

SituationsRule curvesFrequency (times/year)Volume (million cubic meter)Time period (year)
AverageMaximumAverageMaximum

ShortageRC1-Existing0.7924.91712.0003.8008.000
RC2-GA0.5422.25011.0003.2506.000
RC3-FA0.5421.91710.0002.6003.000
RC4-BA0.4582.16711.0002.2003.000
RC5-FPA0.8753.79211.0007.00014.000
RC6-TA0.7502.5429.0006.00013.000

Excess waterRC1-Existing0.9589.19115.85711.50022.000
RC2-GA0.9176.68413.7057.33314.000
RC3-FA0.8336.21413.7055.00012.000
RC4-BA0.8756.48413.7055.25012.000
RC5-FPA0.9588.14615.77011.50014.000
RC6-TA0.9176.99513.7057.33314.000