Research Article

Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge

Table 1

Deviation between the measured deformation value and the target deformation value (measured deformation minus target deformation) (mm).

Arch segment2#3#4#5#6#7#8#9#10#

Deformation difference during concrete pouring−16.3−14.2−13.4−15.3−17.1−14.4−13.1−12.6−15.4
Deformation difference of buckle cable and anchor cable when tensioned−2.9−2.41.72.53.1−2.71.9−2.21.8