Research Article

Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit

Table 1

Material parameter.

SequenceLayerThickness (m)c (kPa) (kg·m−3)k (m·d−1) (MPa) (MPa) (MPa)

Artificial fill2.82.411.715001339
Silt3.21.020.420400.312.51037.5
1Silt4.11.118.921000.311.39.828.7
1Silty clay13.221.415.719500.510630
5Silt8.62.629.71920312.710.436.4
6Silt7.83.726.92050313.213.241.2
2Fine sand6.45.718.41900513.513.540
1Gravelly sand10.84.127.620305013.413.539.4
2Gravelly sand28.45.326.920006013.713.740.5