Research Article

Optimized Partition Scheme for Prefabricated Underpass with Large Cross Section

Figure 8

Prefabrication of the segments and construction of the trench: (a) segments mold, (b) prefabricated segments, (c) segment layout, and (d) trench excavation and support.
(a)
(b)
(c)
(d)