Research Article
Optimized Partition Scheme for Prefabricated Underpass with Large Cross Section
Figure 8
Prefabrication of the segments and construction of the trench: (a) segments mold, (b) prefabricated segments, (c) segment layout, and (d) trench excavation and support.
(a) |
(b) |
(c) |
(d) |