Advances in Civil Engineering / 2021 / Article / Fig 15

Research Article

Analysis of Ground Movement during Large-Scale Pipe Roof Installation and Artificial Ground Freezing of Gongbei Tunnel

Figure 15

Layout of temperature monitoring points. (a) Monitoring points at the inner wall of roof pipes. (b) Monitoring points in the soil.
(a)
(b)

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.