Research Article

Internet of Things-Based Concrete Curing Invention for Construction Quality Control

Table 6

Record of concrete surface temperature and dampness in Experiment B.

Sample/timeSurface temperatureSurface dampness
(1) Air-based curing (°C)(2) IoT-based curing (°C)(3) Manual-based curing (°C)(1) Air-based curing (%)(2) IoT-based curing (%)(3) Manual-based curing (%)

5 minutes20.020.023.911.647.544.1
10 minutes20.020.023.211.642.337.6
15 minutes20.020.023.410.346.833.6
20 minutes20.120.023.211.542.735.4
25 minutes20.120.123.211.544.833.0
30 minutes20.220.223.110.940.932.9
35 minutes20.120.122.510.547.646.6
40 minutes20.020.023.111.744.138.4
45 minutes20.320.022.79.643.835.2
50 minutes20.120.122.411.843.335.8
55 minutes20.020.022.311.543.331.6
60 minutes20.519.922.311.445.245.1
65 minutes20.520.022.111.547.641.2
70 minutes20.520.322.011.442.533.3
75 minutes20.519.722.011.244.346.2
80 minutes20.520.421.911.342.136.1
85 minutes20.020.321.113.545.232.2
90 minutes20.420.021.07.940.035.4
95 minutes20.420.321.09.244.038.7
100 minutes20.120.221.011.438.537.6
105 minutes20.920.221.011.640.033.2
110 minutes20.521.021.010.640.335.9
115 minutes21.020.321.011.643.236.9
120 minutes20.920.421.011.741.434.1