Research Article

Field Test and Numerical Studies on Influences of PVD Spacing on Vacuum Treatment Effects of Dredged Slurry

Table 2

Final PWP dissipations during vacuum preloading period.

Depth (m)T1 (900 mm) (kPa)T2 (800 mm) (kPa)T3 (700 mm) (kPa)

−159.5863.1268.89
−439.2142.2247.83
−715.3216.5818.52