Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material

Table 11

Reduction coefficient of longitudinal grouting pressure.

Construction stageThe circumferential grouting pressure after longitudinal reduction/MPaReduction coefficient

Initial grouting pressure0.10.140.180.220.260.3
Off ring for 0∼8 h0.080.1120.1440.1760.2080.24
Off ring for 8∼16 h0.040.0560.0720.0880.1040.12
Off ring for 16∼24 h0.020.0280.0360.0440.0520.06