Research Article

Disaster Risk Evaluation of Superlong Highways Tunnel Based on the Cloud and AHP Model

Table 4

Values of quantitative risk factors.

Stake numberShape of the tunnel section/m2Reserved deformation/mmLength of single excavation/mAverage buried depth/m

ZK69 + 491∼ZK70 + 03077.86801.5570
ZK70 + 030∼ZK70 + 35577.861000.7366
ZK70 + 875∼ZK71 + 00577.861000.761
ZK71 + 175∼ZK71 + 36077.861500.523