Abstract
Real options modeling, which extends the ability of option pricing models to evaluate real assets, can be used to evaluate risky projects because of its capacity to handle uncertainties. This research utilizes possibility theory to represent private risks of a project, which are not reflected in the market and hence are not fully evaluated by standard option pricing models. Using a transformation method, these private risks can be represented as fuzzy variables and then priced with a fuzzy real options model. This principle is demonstrated by valuing a brownfield redevelopment project using a prototype decision support system based on fuzzy real options. Because they generalize the original model and enable it to deal with additional uncertainties, fuzzy real options are entirely suitable for the evaluation of such projects.
1. Introduction
An option is the right, but not the obligation, to buy or sell a certain security at a specified price at some time in the future [1]. The option pricing model developed by Black and Scholes [2] and Merton [3] is widely used to price financial derivatives. Because option pricing quantifies the values of uncertainties, this technique has migrated to broader usage, such as strategy selection [1], risky project valuation [4, 5], and policy assessment [6]. The idea of employing an option pricing model to value real assets or investments with uncertainties is usually called the real options approach or real options modeling [1, 7]. In real options, risky projects are modeled as a portfolio of options that can be valued using option pricing equations [4].
As options become “real” rather than financial, the underlying uncertainties become harder to deal with. Some risks associated with real options are not priced in the market, violating a basic assumption of option pricing. Hence, volatilities in real options usually cannot be accurately estimated.
The methods proposed to overcome the problem of private risk include utility theory [1, 7], the Integrated Value Process [4], Monte-Carlo simulation [8, 9], and unique and private risks [10]. This paper uses fuzzy real options, developed by Carlsson and Fuller [11], to represent private risk. Representing private risks by fuzzy variables leaves room for information other than market prices, such as expert experience and subjective estimation, to be taken into account. In addition, the model of Carlsson and Fuller can be generalized to allow parameters other than present value and exercise price [11] to be fuzzy variables, utilizing the transformation method of Hanss [12]. The added flexibility that allows the fuzzy real options model to tackle private risks issue also makes it more suitable for risky project evaluations.
We build a fuzzy real options model for brownfield evaluation by extending Lentz and Tse's [13], and develop a prototype decision support system for brownfield redevelopment evaluation to demonstrate the effectiveness of the fuzzy real options approach.
In this paper, option pricing models are introduced first and then used to value real assets as real options. The main issue of real options, private risks, will be addressed systematically. After a summary and comparison of methods to evaluate private risks, this research will focus on fuzzy real options. After a theoretical introduction, brownfield redevelopment, a typical risky project, is discussed briefly. Then a DSS for brownfield valuation based on fuzzy real options is designed and implemented as a prototype.
2. Fuzzy Real Options and Private Risks
2.1. Real Options
Black, Scholes, and Merton proposed their frameworks for pricing basic call and put options [2, 3] in 1973, establishing the theoretical foundation for pricing all options. Because option pricing models acknowledge the value of uncertainty explicitly, they came to be used to evaluate uncertain real assets, called real options. For instance, the managerial flexibility to terminate a project if it proves unprofitable was recognized as a kind of American put option, with sunk cost as the exercise price. Hence, the value of this risky project would be the sum of its initial cash flows and the value of its derivative American put option [8].
As suggested by the above example, the value of a risky project includes not only its present value, but also the portfolio of options associated with it, reflecting the values of uncertainties and associated managerial flexibilities. The following options may exist in different kinds of projects and situations and can be evaluated using option formulas developed for the financial market [1, 5, 7–9].(i) The option to defer. The option of waiting for the best time to start a project can be valued as an American call option or a Bermuda call option.(ii) The option to expand. The option of expanding the scale of the project can be valued as an American call option or a barrier option.(iii) The option to contract. The option of shrinking the scale of the project can be valued as an American put option.(iv) The option to abandon. The ability to quit the project can be valued as an American put option or a European put option.(v) The option of staging. The ability to divide projects into several serial stages, with the option of abandoning the project at the end of each stage (“option on option”), can be valued as a compound option, also called the learning option in some articles.(vi) The option to switch. The flexibility to change the project to another use can be valued as a switch option.
The output of option pricing models usually includes valuations, critical values, and strategy spaces to help a DM to make decisions [1]. This information includes(i)Valuations. The most important output, and the main reason for using a real options model, is the value of the risky project.(ii)Critical values. Threshold distinguishing the best strategy is usually defined in terms of parameters. For example, some critical values determine whether it is optimal to undertake the project. Critical values play a similar role to Net Present Value (NPV) zero.(iii)Strategy space. The critical values divide the multidimensional strategy space into regions, corresponding to which option is best to implement. Often, this output is optional.
2.2. Private Risks
Unlike the uncertainties reflected in stock or bond prices or exchange rates, market data gives very little information about uncertainties in real options. Moreover, inappropriate consideration of uncertainties may make the real options model invalid, an important issue because of the basic assumptions of option pricing models [4, 14].(i)Complete market . All risks can be hedged by a portfolio of options [15]. In other words, all risks have been reflected in the market price and can be replicated as options. In some literature, this is also called the Market Asset Disclaimer (MAD) approach [5].(ii)Arbitrage-free market . There is no profit opportunity unless a player in the market is willing to take some risk [4]. In other words, there is no risk-free way of making money.(iii)Frictionless market . There are no barriers to trading, borrowing, or shorting contracts, and no transaction costs for doing so. Furthermore, underlying assets are infinitely divisible [14].
These assumptions are generally realistic in the financial market, but may not be the case for real options, in part because of the many distinct sources of uncertainty. But more importantly, many uncertainties cannot be matched by any basked of market good, violating the complete market assumption [14]. In fact, it is unusual for project-specific uncertainties to be replicated as a market portfolio. The options modeling process must be customized to make the valuation framework flexible enough to fit real options.
In summary, private risk refers to risks that cannot be valued in the market [1], a simple but difficult issue in applying any real options model. Private risk challenges the complete market assumption, making the output values unreliable. Volatility (), which reflects uncertainties, cannot be estimated objectively.
2.3. Fuzzy Real Options
Projects usually have private risks, which usually cannot be estimated without expert knowledge. Using soft-computing techniques, experts can use their experience to make subjective predictions of private risk. These predictions can be improved using machine learning algorithms. Accumulating additional cases adds to expert experience, so that learning improves the accuracy of private risk estimation.
Among soft-computing techniques, fuzzy systems theory is especially suitable for representation of expert knowledge. Here, fuzzy real options are intended to deal with private risks that are hard to estimate objectively. The plan is to base fuzzy real options on possibility theory [11, 16–18].
The fuzzy approach cannot only model preferences [17], but also take into account subjective uncertainty [11]. In addition, it often requires less data, making it easier to use and quicker to produce satisfactory outputs.
Carlsson and Fuller assume that the present value and exercise price in the option formula are fuzzy variables with trapezoidal fuzzy membership functions. Because inputs include fuzzy numbers, the value of a fuzzy real options is a fuzzy number as well. A final crisp Real Option Value (ROV) can be calculated as the expected value of the fuzzy ROV [11]. Using -cuts ( and denote, respectively, the minimum and maximum values at the -level of membership of a fuzzy variable), the possibilistic mean of the fuzzy variable (denoted ) and the variance was calculated by [11] to be (2.1) and (2.2), respectively.
The concise and effective fuzzy real options approach proposed by Carlsson and Fuller is widely applicable; see [19–21]. But this specific model restrict fuzzy variables to the exercise price and current cash flow. Here, that restriction is avoided by employing fuzzy arithmetic and the transformation method, which is introduced in the following section.
2.4. Fuzzy Arithmetics and the Transformation Method
While fuzzy logics and inferencing systems are well-established, fuzzy arithmetic lags behind. Fuzzy arithmetic is restricted to simple operators [22, 23]. In applications, fuzzy arithmetic is usually limited to several predefined membership functions in MATLAB and Mathematica. This is mainly because the final result may be different depending on the procedure for implementing standard fuzzy arithmetic [12].
Hanss established the transformation method, thereby solving the multiple outputs problem and making generalized fuzzy arithmetic possible [24]. In the transformation method, a fuzzy function is defined as in Definition 2.1).
Definition 2.1. A fuzzy function with fuzzy output , fuzzy inputs , and normal inputs , can be expressed as
The idea underlying the transformation method has three important points: decompose fuzzy numbers into discrete form, use an -cut for calculation purposes as a traditional function, and search the coordinates of the points in the hypersurfaces of the cube. The algorithm of the transformation method is given next [12]:
2.4.1. Decomposition of the Input Fuzzy Numbers
Similar to (2.1), is discretized into a large number of intervals of length . Each fuzzy input is decomposite into a series of crisp values at different -cut levels , where where every element is define as where and denote the minimum and maximum values at the -level of a given fuzzy variable, respectively, as previous.
2.4.2. Transformation of the Input Intervals
The intervals , of each level of membership , , are transformed into arrays of the form with the number of pairs with elements in each set of The above formula fits the case of the reduced transformation method when the fuzzy function is monotonic or has only one fuzzy input. The general transformation method is similar to these formulae [12]. The main difference is that more points are tested.
Denotion of and as pairs of -cut values allows repetitive elements. The order of the elements is critical. The ultimate goal is that the of the th element forms endpoints on the hypersurfaces. As illustrated in Figure 1, in the case of 3 fuzzy inputs shown as 3-dimensional space, the above definition means every has elements, which are located on the endpoints of the cubicle.

2.4.3. Evaluation of the Model
The function is evaluated separately at each of the columns in the arrays using the classical arithmetic for crisp numbers. In other words, if the output can be decomposed to the arrays () using the algorithms mentioned above, the th element can be obtained using the formula as where is the th element of the array and () are the other crisp inputs of the function.
2.4.4. Retransformation of the Output Array
Now the decomposition of the fuzzy output becomes the set . Each element of this set should be the -cut value at each level just like (2.5). Each value is obtained by retransforming the arrays in a recursive manner using the following formula:
2.4.5. Recomposition of the Output Intervals
Recompositing the inverals , of the set based on their membership level , we can get the final fuzzy output .
The transformation method is an ideal solution for implementing generalized arithmetic operations. Hence, it is employed in this paper to integrate the subjective uncertainties into the real options model. This algorithm is one of the key components in building the decision support system for the project evaluation of brownfield redevelopment using the fuzzy real options.
3. Brownfield Redevelopment
3.1. Uncertainties in Brownfield Redevelopment
A brownfield is an abandoned or underutilized property that is contaminated, or suspected to be contaminated, usually due to previous industrial usage [25]. Brownfields are common in cities transitioning from an industrial to a service-oriented economy, or when industrial enterprises have been relocated elsewhere or restructured themselves [26]. Brownfields are associated with an unsustainable development pattern, as they often arise when greenfields are developed while brownfields are abandoned.
Hence, brownfield redevelopment is helpful in enhancing regional sustainability. For example, municipal governments in Canada and elsewhere are encouraging brownfield redevelopment as part of a regional sustainable development plan. If brownfields were successfully redeveloped, local economic transitions would be more fluid; current infrastructure would be reused, and local public health would be more secure.
Brownfield redevelopment is a typical system-of-systems (SoSs) problem, as it involves various systems with complex interactions as illustrated in Figure 2. Brownfield redevelopment has the characteristics of an SoS; it possesses high uncertainty, nonlinear interactions within and among systems and is interdisciplinary in nature [27]. Due to the complex interactions of soil and groundwater systems with societal systems, as well as uncertainties in redevelopment costs, knowledge and technologies, and potentially high liabilities, brownfield redevelopment is difficult to initiate [28]. Uncertainties in brownfield redevelopment can be classified into the following categories.(i)Uncertainties due to limited knowledge of brownfields. Currently, knowledge and data about brownfields are limited. Identifying appropriate models, characteristics, and parameters can be costly and time-consuming.(ii)Uncertainties originating from environmental systems . Environmental systems have complex interactions in different systems, especially between groundwater and soil. Complex site-specific characteristics hinder remediation and redevelopment processes because they usually lead to highly uncertain remediation costs [29].(iii)Uncertainties originating from societal systems. There are various kinds of stakeholders in brownfield redevelopment participating in complex conflicts and interactions, which create high levels of uncertainty in liabilities and cost sharing polices.

Because of the high uncertainties involved in brownfield redevelopment, traditional valuation methods are inoperable. It is very difficult to identify an appropriate discount rate for the Capital Asset Pricing Model (CAPM) [30]. Developers normally require high-risk premiums to compensate for the high uncertainties in brownfield redevelopment projects. Using Net Present Values (NPVs), developers usually calculated negative values for redevelopment projects and thus were reluctant to undertake them [31].
However, brownfield redevelopment can be profitable and even produces higher investment returns in some cases [31–33]. One explanation of the gap between predicted (conceptual) profit using NPV and the actual investment return is that the NPV method fails to map the value of opportunities created under a high uncertainty environment into project values.
These observations motivate the use of the real options model to evaluate redevelopment projects; it may provide more accurate valuations in the presence of high uncertainties. This research builds a prototype decision support system to implement a fuzzy real options model. The effectivenss of the model is tested using hypothetical data derived from actual brownfield redevelopment projects.
3.2. Fuzzy Real Options for Brownfield Redevelopment
Among a couple of available real options models for brownfield redevelopment, model proposed by Lentz and Tse is chosen to be extended with fuzzy variables, which includes an option to remove hazardous materials at the best time and an option to redevelop the brownfield, converting this site into other more profitable usage, at the best opportunity [13]. This model is more generic than others, such as Espinoza and Luccioni [32], in which only one American option is considered and Erzi-Akcelik [33], in which just applied Dixit and Pindyck's model [7]. Hence, an option to defer and option to learn are involved in the evaluation of contaminated properties.
The value of brownfield sites is regarded as two Wiener processes: the cash flow generated from this site without contamination (denoted as ) and the redevelopment cost for this site (denoted as ). To make private risks distinct from market ones, both of them are treated as two partially hedged portfolios, cash flow portfolio (denoted as ) and redevelopment cost (denoted as ), respectively.
In addition, four coefficient parameters with regard to and are involved. The parameters and focus on cash flows. As cash flows from all states are being proportional to the clean one, the cash flow generated under contamination is ; cash flow after removal is regarded as resumed to the clean one with ; and cash flow after redevelopment is . The coefficients and denote the removal and restoration costs as and , which are assumed to be proportional to the total redevelopment cost as well. Therefore, the cleanup cost equals .
Overall, three critical values are involved in deciding three kinds of strategies, which are denoted as , , and in [13, Formula 14]: do nothing, remove pollutants and redevelop sequentially, or remove and redevelop simultaneously. Values to be compared with these critical values are, respectively, , the ratio of the clean cash flow () to the redevelopment cost (), , the ratio of the clean cash flow () to the cleanup cost (), and , the ratio of the clean cash flow () to the combined cost of removal and redevelopment as a joint action. In addition, all supplementary formulae are shown as [13, Formula 12]:
If the contaminated properties were to be cleaned and redeveloped sequentially, their values can be expressed as [13, Formula 13], depending on the critical value of as [13, Formula 14]. If , the removal action should be taken right now. Otherwise, the optimal executing time is in [13, Formula 16]. After the cleanup action, redevelopment is better to be conducted when in (3.5):
If the brownfield sites were to be cleaned and redeveloped simultaneously, their values can be expressed in [13, Formula 15], depending on the critical value of in (3.3). If , the removal action should be taken right now. Otherwise, the optimal executing time is in (3.5): for , where and .
The final value of the brownfield site is the maximum of and . An optimized redevelopment strategy can also be formed based on where it locates in the decision region, since all critical value can be converted into .
4. Decision Support System Design and Case Study
4.1. System Architecture
The system architecture of the DSS is shown in Figure 3. Experts input parameters via the layer of the Windows Presentation Foundation (WPF) are given in Figure 4. After that, an event and process management module will control the work flow to convert all information using the format of MatLab and feed them into MatLab for actual computation using the proposed fuzzy real options algorithm. Basically, fuzzy data are first converted (fuzzified and defuzzifed) into the crisp value needed for the real options model. Then, output can be obtained by calling the real options formula. Finally, the last output will be presented graphically via WPF to users.


Although prototype developed in this paper is primitive, the system architecture is quite generic and extendable. This DSS can be gradually expanded in scale and become more complex with more functions. The developed prototype satisfies the goal of a feasibility study on both the algorithm and technical approach in building this DSS.
4.2. An Illustrative Example
To demonstrate the fuzzy real options modeling, a brief example using hypothetical values is presented to illustrate an application of the associated DSS. These data mainly come from Lentz and Tse's paper [13], so that the DSS can be tested by comparing with their result. In addition, although inputs data are imaginary, they are modified according to real data in some articles on brownfield redevelopment, such as [33, 34] and added with some fuzzy parameters. The input data are shown in Table 1.
In addition to the data used in Table 1, all variables in this model are allowed to be fuzzy ones, in order to incorporate expert knowledge into parameter estimation. Given that the most difficult task in brownfield redevelopment is to estimate uncertainties regarding the redevelopment cost, which belongs to the private risk, the volatility rate of the redevelopment cost, , is deemed to be a fuzzy variable and studied intensively in this paper.
The volatility of the redevelopment cost is hard to estimate mainly because the dissemination of pollutants underground is highly complex. Soils, rocks, and materials are distributed ununiformly. Their hydraulic conductivities vary greatly according to the materials, elevation, and seasonal change. For instance, groundwater passes through peat (or cinders) at the velocity of 177 cm/d, which is hundreds of times the speed in the silt till (0.49 cm/d) at the site of the Ralgreen Community in Kitchener, ON, Canada [34]. Moreover, redevelopment cost also depends on the residual rate of pollutants and excavation cost, which are hard to estimate using market data neither.
To overcome this problem, the fuzzy redevelopment volatility is utilized as one with a triangle membership distribution based on parameters of minimum value, maximum value, and most likely value, because project managers and experts usually estimate uncertain parameters using the three-point estimation method [35]. Based on the hydraulic conductivity, volume of contaminated soil, and elevations, we found that the 20% volatility rate, used in Tse and Lentz's article [13], is roughly realistic. Nonetheless, since there are only two wells drilled for sampling, a relatively large interval should be added. As the result, the fuzzy redevelopment volatility is inputed as (0.15, 0.2, 0.25).
The main result from the DSS is shown in Figure 5, which includes the value of the brownfield site, a suggestion for a redevelopment strategy, and associated critical values that lead to this suggestion. In this case, the property value is a fuzzy variable with a mean of around 6.3 million and variance of around 1.7 million. Obviously, the private risk of redevelopment volatility has a great effect on the value of brownfield properties. And because the output indicators ( and ) are less than their corresponding critical values ( and ), this site is not worth of redeveloping now. This result partially explains why developers are reluctant to undertake this redevelopment task.

Moreover, the critical values are fuzzy outputs as well. The fuzzy boundaries differentiating optimal strategies are illustrated in Figure 6. Also, these critical values can be converted into the ratio of and shown in one figure as different decision regions in the strategy space (Figure 7). Fuzzy areas are calculated based on their fuzzy means and standard deviations. This DSS provides decision makers an intuitive decision suggestion with the aid of the decision region chart.


Finally, the effect of subjective estimation on property value is studied by changing the fuzzy intervals (minimum and maximum values of the fuzzy redevelopment volatility) while holding the most likely value unchanged, also as a kind of sensitivity analysis. Based on the illustrative example, we found that the value of the contaminated property increases as the fuzzy interval enlarges, as shown in Figure 8. This result implies that the subjective estimation of the private risk has an effect on the final evaluation result, although the change is not too much. Furthermore, experts can take advantage of their knowledge to make a slightly higher profit in the brownfield redevelopment projects than others. And the variation of the fuzzy output increases gradually, suggesting that there is no abrupt change and associated critical value in the fuzzy real options model.

5. Conclusions and Future Work
This paper employs a fuzzy real options approach to deal with the private risk problem. With help of the transformation method, any parameter in a real option model can be estimated as a fuzzy variable. Based on the results from the illustrative example using the prototype DSS, we found that this approach is effective in dealing with the private risk and generating satisfactory evaluations and useful suggestions. Hence, based on our limited test, the DSS based on the fuzzy real options is a useful tool in risky project evaluations. It potential for application should be further studied.
In addition, from the result of the illustrative example (Figure 8), we see that possibilities as well as probabilities can affect evaluations of risky projects. For the case of brownfield redevelopment, expertise can be utilized to make the contaminated property more valuable. This effect needs to be further analyzed.
But it should be recognized that the fuzzy real options model in this paper has several limitations, some of which may be removed in future work. Fuzzy arithmetic permits any membership function to be utilized in real options. This flexibility builds a foundation for future application of soft-computing techniques. For instance, the neural network could provide a nonparametric adaptive mechanism for private risk estimation. The DSS will be enhanced if it can be made to behave intelligently and adaptively.
A key feature of the fuzzy real options proposed here the mixture of fuzziness and randomness describing hybrid markets and private risks. But one limitation of our approach is that these two features are not well-integrated. Randomness is represented as a stochastic process, while fuzziness is represented using only fuzzy arithmetic. Incorporating a fuzzy process would clarify the structure, perhaps producing some important new insights.
A unifyied process including both fuzzy and stochastic features could strengthen the idea of fuzzy real options and extend enormous flexibility to soft-computing techniques and statistical models associated with these options. This goal may be achieved with the aid of the chance theory proposed by Liu [36].
Finally, since the fuzzy real options approach helps to improve developers' evaluation on brownfields, game-theoretic approaches could later be employed for negotiation of governmental assistance in the brownfield redevelopment to achieve optimal results.