Advances in Decision Sciences

Advances in Decision Sciences / 2011 / Article

Research Article | Open Access

Volume 2011 |Article ID 205039 | 15 pages | https://doi.org/10.1155/2011/205039

A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

Academic Editor: C. D. Lai
Received04 May 2011
Accepted10 Jun 2011
Published01 Aug 2011

Abstract

Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it consider two factors only, that is, downtime and frequency of failures. We consider third factor, cost, in this study for failure-based maintenance. The objective of this paper is to introduce the formulae to estimate maintenance cost. Methods. Fish bone analysis conducted with Ishikawa model and Decision Making Grid methods are used in this study to reveal some underlying risk factors that delay failure-based maintenance. The goal of the study is to estimate the risk factor that is, repair cost to fit in the Decision Making Grid model. Decision Making grid model consider two variables, frequency of failure and downtime in the analysis. This paper introduces third variable, repair cost for Decision Making Grid model. This approaches give better result to categorize the machines, reduce cost, and boost the earning for the manufacturing plant. Results. We collected data from one of the food processing factories in Malaysia. From our empirical result, Machine C, Machine D, Machine F, and Machine I must be in the Decision Making Grid model even though their frequency of failures and downtime are less than Machine B and Machine N, based on the costing analysis. The case study and experimental results show that the cost analysis in Decision Making Grid model gives more promising strategies in failure-based maintenance. Conclusions. The improvement of Decision Making Grid model for decision analysis with costing analysis is our contribution in this paper for computerized maintenance management system.

1. Introduction

One of the main challenges in maintenance model is to improve the way we maintain equipment and defend the maintenance decisions. Improved technology and the increased sophistication of maintenance personnel have led some companies to improve their reactive approach. Proactive strategies utilize preventive maintenance activities to prevent the failures from occurring at an early stage [1]. Reference [2] developed analyses based on polling models, which could be used to obtain system performance metrics when preventive maintenance is conducted. They calculated the weighted sum of mean service waiting times to measure the overall preventive maintenance performance system. Some formulas are given by [2] to estimate preventive maintenance and manufacturing system performance. The preventive maintenance service is based on measurements going beyond a predetermined limit. If a machine cannot hold a tolerance, then other techniques, such as a condition-based maintenance (CBM) and vibration-based maintenance, are initiated. All this maintenance involves costs.

In this study, we make comparison study on various maintenance techniques to estimate the reliability of machineries and embed them into computerized maintenance management system (CMMS). References [3, 4] used stochastic measures to analyze cost in condition-based and failure-based maintenance in gas turbine productions. Bayesian and Proportional hazards model have been used by [5] to analyze cost in preventive maintenance. Later, [6] used mathematical measures to estimate cost in reliability-centred maintenance. They used simulation studies to optimize the plant and wrote a program in computerized maintenance management system. Reference [7] tinted few important reasons on why industries are still lacking on decision support system:(i)difficulty to collect raw data;(ii)computational complexities;(iii)complexity of modelling failure distribution;(iv)gap between theory and practice; (v)managers are unaware of the various types of maintenance optimization models.

As mentioned, there is little assessment of the successful applications of the maintenance optimization model and they are still underexplored in CMMS. Decision Making Grid model can be used to identify strategies for maintenance decision in CMMS. However, the model has limitation as it considers two factors only, that is, downtime and frequency of failures. We consider third factor, cost, in this study for failure-based maintenance. In this study, we sought to introduce costing formulae for Decision Making Grid model. This will contribute for optimization algorithm development in CMMS.

2. Multiple Criteria Decision Making Methods

One of the most common problems in many engineering and business applications is how to evaluate a set of alternatives in terms of a set of decision criteria. For example, let someone intends to set up computer servers. There are a number of different configurations available to choose from. The different operating systems are the alternatives. Here, a decision should also consider cost and performance characteristics, such as processing unit speed, memory capacity, network bandwidth, and number of clients. Alternatives of software, maintenance, and expendability should be considered too. These may be some of the decision criteria for this case, where the criteria may vary based on different purpose of the servers. The multiple criteria decision making (MCDM) model is the problem-solving method, always used to determine the best alternative for the above example.

The model consists of a finite set of alternatives, which decision makers have to select or rank to a finite set of criteria, weighted according to their importance. Then, the model is structured to alternatives and decision criteria. Each alternative can be evaluated in terms of the decision criteria. After that, the relative importance or weight of each criterion can be estimated. Let , where and , denote the performance value of the th alternative in terms of the th criterion. Also, let denote the weight of the criterion . Then, [8] gave the core of the typical MCDM as given in the following multicriteria matrix:

The decision matrix is constructed, complete with the priority rating of each alternative with respect to each criterion, using a suitable measure. The evaluation ratings are then aggregated, taking into account the weights of the criteria, to get a global evaluation for each alternative and a total ranking of the alternatives. Given the above decision matrix, the decision problem considered in this study is how to determine which is the best alternative with the decision criteria combined. For instance, if the decision problem is to select the best project to be funded, then one is only interested in identifying the best candidate project. In another case, if it is to allocate the budget among a number of competing projects, then one may be interested in identifying the relative importance of each project, so that the budget can be distributed proportionally to the significance of each project.

In a simple MCDM situation, all the criterions are expressed in terms of the same unit, such as Saudi Riyals, hours, and metres. However, in many real-life MCDM problems, different criteria may be expressed in different units. Examples of such units include pound figures, political impact, regional impact, and so forth. These multiple dimensions make an MCDM problem more complicated. That is why research in MCDM is numerous, diverse, and found in many applications, as is shown by the examples given in Table 1.


ResearcherFocusApplicationApproach

[9, 10]Design, development, and implementation of CMMS with criteria analysis and decision mapping customized features on maintenance maturity grid and decision analysisAutomotive sectorMathematical formulas DMG

[11]Development of procedure and algorithm to evaluate alternatives in flexible manufacturing systemMathematical analysis and simulationMCDM algorithm with fuzzy data

[7, 12]Development of hybrid intelligent approaches systematic analysis of the system with combination on multiple criteria analysis and fuzzy rule-based techniquesMathematical calculation and simulation using fuzzy logicDMG multiple criteria decision analysis fuzzy logic rules

[13, 14]Solution to perform a multivariate design and multiple criteria analysis of alternate alternatives based on the enormous amount of information. Development of multivariate design method and multiple criteria for a building refurbishment’s analysisPublic building of Vilnius Gediminas Technical UniversityDecision-Making matrix Weightage analysis

[15]Optimization framework on optimal maintenance planning arrangement of maintenance schedules for PM by considering few criteria: availability, maintenance cost, life cycle costs, and tolerance levelPaper production, nuclear production plantMultiple-objective genetic algorithm MATLAB toolbox

[16]Survey result to show the applicability of an approach based on a combination of distribution-free tolerance interval and genetic algorithms for testing and maintenance optimization of safety-related systemsSimulation using Monte Carlo and genetic algorithmMultiple-objective genetic algorithm

Reference [17] used multiple criteria evaluation of multifamily apartment block's to benchmark maintenance contractors. They built the model for maintenance contractor evaluation and the determination of its selection. Later, [18] applied the model in Lithuanian case study. Reference [7] introduced another model, Decision-Making Grid (DMG) for similar problem to identify maintenance strategies. He revealed that DMG is the most suitable model for continuous improvement in MCDM by identifying top ten worst production machines. This is because when machines in the top ten lists of worst performers have been appropriately dealt with, then others will move down in the list and resources can be directed at these new offenders. If this practice is continued from time to time, then all machines will eventually be running optimally.

3. Decision-Making Grid Model

There are many researchers who have studied the DMG and apply it in the equipment management area. We extended the study of these three selected reviews. In the first, [9] has introduced the DMG model to help maintenance management identify breakdown maintenance strategies. In short, DMG is a control chart in two-dimensional matrix forms. The columns of the matrix show the three criterions of the downtime, whilst the rows of the matrix show another three criterions of the frequency of the failures. The model consists of these three steps:(i)criteria analysis;(ii)decision mapping; (iii)decision support.

Here, a better maintenance model for quality management can be formed by handling both the rows and columns of the matrix, respectively. The matrix offers an opportunity to decide what maintenance strategies are needed for decision-making, such as to practice OTF, FTM, SLU, CBM, and DOM.

The second important review was undertaken by [10], in which implementation of DMG in CMMS was discussed in detail. They extended the theory of the maintenance maturity grid and implemented it into a disk brake pad manufacturing company in England. The results can provide maintenance policies in the respective functional group in production lines, to achieve their common goal to reduce downtime. Later, [7], in the third review, comprehended the model and demonstrated the hybrid intelligent approach using the DMG and fuzzy rule-based techniques. In this study, the DMG is extended with costing analysis in small and medium food processing companies to identify the maintenance strategies.

DMG is used in this study as the model is flexible and considers OTF, FTM, SLU, CBM, DOM, TPM, and RCM strategies in the same grid. The model is able to analyze multiple criteria and is the best choice when the number of machines is less than fifty [19]. It can be used to detect the top ten problematic machines on the production floor with several system conditions. This is with regards to failures such as fatigue, imbalance, misalignment, loosened assemblies, and turbulence, which can occur in rotational or reciprocating parts such as bearings, gearboxes, shafts, pumps, motors, and engines. Identifying the top ten problematic machines is in alignment with the 80-20 rule.

The rule states that 80% of the problems arise from the same 20% of the root causes. In another word, once 20% of the root cause had been fixed, then 80% of the problem is resolved. The application of the model can have a breakthrough performance, as it fulfils the purpose of the model to map machines into a certain grid in a matrix and suggests the appropriate maintenance strategies to comply with.

4. Preliminary Analysis

In this research work, we conducted formal interviews with multinational bearing manufacturers in Malaysia. We asked about the customers’ complaint about their production parts performance after the sales. They gave feedback on the reason why the warranty period of certain parts is one year, but there are still cases of the failure of parts within eight months of the product’s deployment. Based on the manufacturer’s records, 14% of the parts’ failure before expiry of the warranty is due to contamination in the equipment usage area. Another 34% is due to a fatigue where equipment is utilized for too long and 16% of these defects are due to poor fitting during installation. The highest remaining portion is 36%, due to routine maintenance. The technical team highlighted that the highest proportion of routine maintenance is due to these factors:(i)low quality of the lubrication oil;(ii)lubrication quantity is too little or over the given specification limit;(iii)preventive maintenance frequency is too frequent or very rare;(iv)incorrect tools are used for repair and preventive maintenance; (v)poor technician skills.

Companies have to strictly follow manufacturer specification or study their best-known practice to improve these factors. However, this will definitely increase the maintenance cost. When the machines deploy in SMI, they follow an important process in their flow of the useful life cycle, which is shown in Figure 1. We also discovered that the maintenance team can learn from the defect during the diagnostic and repair phases, to continuously restructure some improvement strategies in other phases. Further study on failure modes and effect analysis can detect how bad the defect characteristics are. Then, recommendations can be given to improve the equipment’s reliability during its life span.

In this study, further analysis on FBM or the diagnose and repair box in Figure 1 is investigated by formal interviews in small and medium food processing industries. The purpose of the interviews is to reveal some underlying risk factors that delay FBM time. The factors are identified with the Fishbone analysis using Ishikawa diagram, as shown in Figure 2. Then, some strategies can be executed to reduce FBM time, such as(i)improve preventive maintenance strategies;(ii)use good quality replacement parts;(iii)use good tools for repair and collaboration; (iv)restructure man-hours on repairing the equipment.

However, most of the time, implementing these strategies will increase the maintenance cost. Reference [20] proposed some structures for maintenance policy decision strategies, that is, when to practice UBM, CBM, or FBM at any phase of the machine’s life cycle. Reference [21] suggested more measurement of service processes studies using mathematical models. Reference [22] used systematic mathematical measurements on covariates, illustrated by the use of the semiparametric, multistate hazards model for transition, and reverse transition among more than one transient state, which emerged from follow-up studies.

Reference [23] used the proportional-hazards model to analyse transitions in human contraceptive recovery over time and to illustrate the score test on testing the equality of parameters for models on transitions and repeated transitions. Then, [24] employed the competing risk model proposed by [23], to estimate the risk factors that delay the equipment’s downtime. Reference [24] estimated the relationship between repair time and various risk factors of interest, including underlying characteristics of the technicians, that is, their age, experience, and qualifications.

Reference [25] analysed downtime of the machines by exploring the general renewal process for repairable systems. They used the Kijima Model II to model complex repairable systems. A general likelihood function formulation for single and multiple systems with the time-truncated data and failure-truncated data is applied to estimate parameters, using Weibull software. However, [25] used only one parameter, that is, failure time in their analysis, which is insufficient in the proposed study.

Reference [26] defined DMG as a control chart in itself in two-dimensional matrix forms. The columns of the matrix show the three criteria of the downtime, while the rows of the matrix show another three criteria of the frequencies of the failures. A better maintenance model for quality management can be formed, by handling both the rows and columns of the matrix, respectively. The matrix offers an opportunity to decide what maintenance strategies are needed for decision making, such as to practice OTF, FTM, SLU, CBM, or DOM. The matrix can also be used to decide what maintenance concepts are useful for each defined cell of the matrix, such as the TPM or RCM approaches. References [26, 27] have described an application of AHP for selecting the best maintenance strategies. Later, [7] mentioned that the DMG analysis is a very important measure prior to the AHP analysis.

We have discovered from the interviews and survey that the optimization strategies in SMI should not be based solely on the machines’ downtime and frequency of failures. Yet, another important factor, the cost of maintenance, should be considered seriously for FBM jobs in SMI. Once the most problematic machines with higher maintenance costs have been identified, then further decision analysis is conducted to improve their time-based maintenance by(i)identifying candidates (machines) for the DMG model using cost analysis,(ii)extending the DMG model suggested by [7, 10] by incorporating it with the costing analysis, (iii)giving appropriate suggestions on maintenance strategies.

The combination of the results is important as a membership function, to derive fuzzy logic rules for maintenance policy and decision making, as suggested by [7].

5. DMG and Costing Evaluation

References [7, 10] have demonstrated DMG as a powerful model in CMMS to analyse raw data for strategic decision making. Reference [26] considered the top ten worst production machines based on two criterions: downtime and frequency of failures. Then, they mapped those machines into DMG and recommended appropriate maintenance strategies depending on the location of the machines in the grid.

The top ten machines that meet both criterions are then associated in the grid, as shown in Table 2, with respect to the multiple criteria, as follows [26]:(i)OTF: machine is very seldom failed. Once failed, the downtime is short;(ii)FTM1, FTM2, FTM3, FTM4, FTM5: failure frequency and downtime are almost at moderate cases;(iii)SLU: machine is always failed, but it can be fixed quickly;(iv)CBM: machine is very seldom failed. But once failed, it takes a long time to bring it back to normal operation; (v)DOM: machine is always failed. Once failed, it takes a longer time to bring it back to normal operation.


FrequencyDowntime
LowMediumHigh

LowOTFFTM1CBM
MediumFTM2FTM3FTM4
HighSLUFTM5DOM

Reference [28] listed the importance of CMMS, but it appears to be used less often as a tool for analysis and maintenance coordination. It happens to only be a data store in which to keep equipment information and its maintenance activities. Thus, [26] makes a very good improvement of CMMS by using a formalized decision analysis approach based on multiple criteria and DMG, to find the worst production machines. The policy emphasizes the fact that the best policy is the one that maximizes profit. Reference [29] designed a computer-aided integration of maintenance in their model.

Later, [10] embedded [26] DMG approach as a visual tool in their CMMS to obtain a good decision support system. They have implemented the CMMS with DMG in one of the brake pad manufacturing companies in England. Reference [30] identifies the importance of the study by measuring the relationship between maintenance strategies and performance. Reference [30] discovered a strong positive relationship between maintenance strategies and performance. By having impact studies, manufacturing managers may be more comfortable in making investments in maintenance.

Reference [31] applied [10, 26] approaches by implementing DMG in one of the food processing companies in Malaysia. They discovered that the DMG analysis creates more opportunities in CMMS to be transparent to the entire production workforces, instead of only the maintenance team. The increased usage of data mining and DMG analysis in CMMS by personnel outside maintenance function may have a good potential to improve maintenance strategies and equipment utilization.

Another important criterion, that is, cost of the failure analysis prior to DMG association, is considered in this research work. For instance, if we look at SMI operation in Malaysia, they tend to outsource most of the corrective maintenance work to contractors. From the SMI management view, the machine is not considered as the worst machine if the cost impact to the factory is minimal. However, if the cost impact is high, then the machines are considered to be the worst, even if their frequencies of failures are lower. Moreover, cost is always a crucial factor for production during this recent economic depression.

References [7, 31] recommended upgrading operators’ technical skills in repairing the machines in the FTM1, FTM2, and SLU regions, as shown in Table 2. This will reduce the cost of maintenance in the long term, because operators are able to fix the problem without any escalation to the technicians. Hence, waiting time for technicians is eliminated. When the DMG analysis is conducted again in the next cycle, those machines in the FTM1, FTM2 and SLU regions in the previous cycle will most likely appeare again in the DMG model, as the frequency of failures is still high [31]. This could be misleading because analyses are executed regardless of costing evaluation.

In fact, the machines are supposed to be excluded from the DMG model in the next cycle. This is due to a reduction in the maintenance cost, even though their frequencies of failures are still high. The cost is reduced as the operators managed to fix the problem, with no maintenance escalation to technicians or contractors. Otherwise, the blocks of the grid are occupied and other machines with a higher cost of failure cannot be fitted into the DMG for the next cycle.

6. Machine Prioritization for the DMG

Some of the major expenses incurred in manufacturing industries are related to repairs and the replacement of failure parts. When the failure occurs, the affected production time is counted as a part of the losses. Corrective maintenance activities are performed to restore the system to a reasonable operating state. Transportation, tools, and machines used for repair and calibration are considered as expenses too. Next, preventive maintenance takes place at regular intervals to reset the system to a good working condition.

Reference [4] defined the random variables, and , to be the lifetimes after PM and CM, respectively. Their known parameters are and , respectively, with the distributions as follows [4]:Gamma: ;Weibull: ;Log-normal: .

Reference [4] used the hazards function, where measures the time since the most recent event with the baseline hazards function. Note that the exponential distribution is a limiting case of the Gamma and Weibull as . Suppose that the downtimes corresponding to PM and CM are and , respectively, with associated costs being and , respectively. These costs include the cost of parts, labour, and downtime. Then, we can estimate cost of PM in the interval length of . First, allow units of downtime for PM and generate observation from new function , to represent a typical lifetime following PM. From the observation, [4] commented that the interval is complete and the total cost incurred is if . Otherwise, if , then we should add a CM downtime . If , then the interval is complete with a cost of .

Alternatively, if , then an observation is generated from , to represent a typical lifetime following CM. Let this process continue, generating CM lifetimes until this interval is complete, and calculate the total cost, , for the interval in the same manner [4]. Having completely simulated a PM interval of length , we repeat this procedure times and determine the total cost for these simulated intervals for . Then, the average total cost is [4] for the selected maintenance interval length.

Let and be vectors. Let us include with higher cost, where SMI manager is unhappy with the charges to vector , whereas with a specified range and where the manager can tolerate the charges assigned to vector . Thus, more investigation should be conducted on all machines rolled under vector .

Let be the actual unit price of the replacement part, and then is the unit price of the replacement part stated in the catalogue. Likewise, let be the actual labour or service charge for the repair work, and let be the labour or service charge stated in the service agreement. Then, rules of inference can be used to tie the equivalence together. When any failure of the occurs, proposition of the maintenance cost is assigned to vectors   and as follows:

If , then

Note that machines with unexpected or higher costs are rolled under . Let and be propositions, denoted by . Let be the hypothesis, where is equal to 1 if adding to , means FBM cost is expensive, whereas is the hypothesis, where is equal to 1 if , where add to . The conjunction of is true when both and are true and is false otherwise. We can prove this conjunction using the truth table given by [32] as shown in Table 3.



111
100
010
000

At this point, both propositions have to be considered and fulfilled. The rationale behind this is the maintenance department decision either charge is expensive or exceptional, whereas is the comparison of price between actual and expected from the price catalogue listed by supplier or manufacturer. In brief, both and conditions have to be fulfilled. Then, those machines appeared in vector and are candidates in the DMG model. In brief, we improve DMG model by this algorithm:(i)evaluate maintenance cost for ,(ii)assign the to vector , , and ,(iii)build criteria analysis matrices for machines in vector and ,(iv)conduct decision mapping analysis, (v)suggest decision support strategies for .

We wrote visual basic code to execute these formulae in our decision support system to estimate the maintenance cost.

7. Empirical Results

As a case study, the present study observed the maintenance operation in a food processing company in Malaysia, with the main characteristics being as follows:(i)reliability: they must work for ten hours a day, six days a week, and based on demand;(ii)every machine may have a different frequency of failures. Once failed, it has a different downtime, including waiting and repairing time; (iii)machines operate in serial lines to manufacture seven types of products in different volumes.

The machines’ operation and failures are observed, and real dataset is collected. The machine name (ID), frequency of failure (Freq), downtime, mean downtime (MDT), standard deviation (Std dev), and mean time between failure (MTBF) of the machines are given in Table 4.


IDFreqDowntimeMDTStd devMTBF

A12.002.006238.00
B389.1529.7219.032050.28
C8193.2024.151.02755.85
D213.106.556.573113.45
E533.006.6011.051241.40
F16249.5315.6010.29374.40
G5129.2625.851.401222.15
H30737.1924.571.11183.43
J573.3514.6713.011233.33
K354.1418.0514.572061.95
L18.418.416231.59
M19188.409.9213.02318.51
N963.487.059.36686.28
P233.0816.5420.533103.46

In this research work, the DMG model is proposed to visualize machine maintenance in its production lines. The DMG model introduced by [26] is used, where two major factors of machine failure, that is, frequency of failure and downtime, are considered. The factors are separated into three different criterions, that is, high, medium, and low. Let be the highest value and let be the lowest value in the list:

A query instruction is developed in CMMS to select the top ten machines that have the highest frequency of failures. Likewise, the top ten machines having the highest downtime are selected from the CMMS. Subsequently, the machines are categorized using formulae in (7.1). Reference [26] listed three steps in DMG development:(i)criteria analysis: establish a Pareto analysis of the two factors: frequency of failure and machine downtime,(ii)decision mapping: Those machines that meet both criteria in step (i) are then mapped into the two-dimensional matrix as shown in Table 5, (iii)once mapping has been finalized, the decision is developed by comparing the two-dimensional matrix with DMG shown in Table 2.


FrequencyDowntime
LowMediumHigh

LowJ, KG, B
MediumNC
HighMH, F

Note that Machine B, Machine C, Machine F, Machine G, Machine H, Machine J, Machine K, Machine M, and Machine N are mapped into the DMG in Table 5.

After giving the recommendation and restructure maintenance strategies, we collected the longitudinal data again and the DMG model is shown in Table 6. Note that Machine A, Machine B, Machine E, Machine G, Machine H, Machine J, Machine M, and Machine N are mapped into the DMG table. The analysis was obtained before introducing the cost parameter.


FrequencyDowntime
LowMediumHigh

LowB, H, NG
MediumJAE
HighM

Queries on raw data from CMMS are retrieved from time to time to discover knowledge for good decision making. We obtained all machines in vector . Subsequently, we calculated the FBM cost for individual machinei in vector using Boolean algebra formulae in (6.2). Visual basic script is run to categorize the machine. As a result, machine with higher cost rolled under vector as shown in Table 7. Machines in vector are candidates for DMG, whereas machines in vector should be excluded from the DMG model.


VectorMachine

A, C, D, E, F, G, H, I, J, M
B, K, L, N, O, P, Q, R, S, T

In the case study, machines in vector are given priority to be fitted into the DMG model as shown in Table 7. Note that Machine C, Machine D, Machine F, and Machine I are excluded from DMG in Table 6, even though their maintenance cost is higher than Machine B and Machine N. Based on Table 7, Machine C, Machine D, Machine F, and Machine I have a higher priority to be mapped in the DMG for maintenance strategy and decision-making consideration. In contrast, Machine B and Machine N should be excluded from DMG, as the operators are able to fix the problem and their maintenance cost is therefore reduced. Machine E and Machine G have changed position in Table 8 because it is compared with other machines, that is, Machine C, Machine D, Machine F, and Machine I, which do not exist in Table 6. This is the evidence which shows that the DMG analysis in Table 8 provides a more promising result compared to that shown in Table 6.


FrequencyDowntime
LowMediumHigh

LowD, IC, H
MediumJAG
HighFEM

The above costing analysis is more practical, where Machine C, Machine D, Machine F and Machine I must be in the model even though their frequency of failures and downtime are less than Machine B and Machine N. This is because they have a higher maintenance cost compared to Machine B and Machine N, as shown in Table 7. To be more transparent, it is worth displaying the DMG matrix in Table 8, complete with the machine images or using colour codes on the production floor. The visualization will help to get more attention from the production team of the machines’ performance. Perhaps this will alert them to any failures of the worst performing machines in their production plant.

8. Conclusion

This paper demonstrated how the costing analysis prioritize machine for DMG. The Ishikawa diagram is used to select the problematic machines by looking at their maintenance cost. The rules are used to categorize the machines into lower and higher maintenance cost. The results presented show that cost model can be used in failure-based maintenance systems, as it provides a powerful tool for taking into account the interaction between the frequency of failures and downtime. Using this repositioning into DMG model, managers are able to select maintenance policies more economically. Beyond improving the quality of decisions, the DMG can better support the maintenance team to decide on several maintenance strategies. Further research is needed to adequately quantify the parameters in the above rules for different machines.

Acknowledgments

The authors would like to thank the Faculty of Computing and Information Technology, Rabigh, King Abdul Aziz University Rabigh for financial support and facilities. Also thanks are given to the Faculty of Information and Communication Technology, Universiti Teknikal Malaysia Melaka for granting the main author for the attachment program in King Abdulaziz University.

References

  1. L. Cui, W. Kuo, H. T. Loh, and M. Xie, “Optimal allocation of minimal and perfect repairs under resource constraints,” IEEE Transactions on Reliability, vol. 53, no. 2, pp. 193–199, 2004. View at: Publisher Site | Google Scholar
  2. D. Gupta, G. Yavuz, and M. M. Srinivasan, “The relationship between preventive maintenance and manufacturing system performance,” The European Journal of Operational Research, vol. 132, no. 1, pp. 146–162, 2001. View at: Publisher Site | Google Scholar | Zentralblatt MATH | MathSciNet
  3. T. A. Thorstensen and M. Rasmussen, “A cost model for condition based overhaul or replacement,” Journal of Quality in Maintenance Engineering, vol. 5, no. 2, pp. 102–113, 1999. View at: Publisher Site | Google Scholar
  4. K. Frank, “A replacement policy based on limiting the cumulative maintenance cost,” International Journal of Quality and Reliability Management, vol. 18, no. 1, pp. 76–83, 2000. View at: Google Scholar
  5. F. P. David and K. A. H. Kobbacy, “Determining economical maintenance intervals,” International Journal of Production Economics, vol. 67, no. 1, pp. 87–94, 2000. View at: Publisher Site | Google Scholar
  6. H. A. Gabbar, H. Yamashita, K. Suzuki, and Y. Shimada, “Computer-aided RCM-based plant maintenance management system,” Robotics and Computer Integrated Manufacturing, vol. 19, no. 5, pp. 449–458, 2003. View at: Publisher Site | Google Scholar
  7. A. W. Labib, “A decision analysis model for maintenance policy selection using a CMMS,” Journal of Quality in Maintenance Engineering, vol. 10, no. 3, pp. 191–202, 2004. View at: Publisher Site | Google Scholar
  8. K. Genova, V. Vassil, F. Andonov, V. Mariyana, and K. Silvia, “A multicriteria analysis decision support system,” in Proceedings of the 5th International Conference on Computer Systems and Technologies, vol. 3, pp. 101–106, 2004. View at: Publisher Site | Google Scholar
  9. A. W. Labib, “A logistics approach to managing the millennium information systems problem,” Logistic Information Management, vol. 11, no. 5, pp. 285–294, 1998. View at: Publisher Site | Google Scholar
  10. O. Fernandez, R. Walmsley, D. J. Petty, and A. W. Labib, “A decision support maintenance management system development and implementation,” International Journal of Quality and Reliability Management, vol. 20, no. 8, pp. 965–979, 2003. View at: Publisher Site | Google Scholar
  11. E. E. Karsak, “Fuzzy MCDM procedure for evaluating flexible manufacturing system alternatives,” in Proceedings of the IEEE Annual Reliability and Maintainability Symposium, no. 0-7803-6442-2, pp. 93–98, 2000. View at: Google Scholar
  12. B. Al-Najjar and A. Imad, “Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making,” International Journal of Production Economics, vol. 84, no. 1, pp. 85–100, 2003. View at: Publisher Site | Google Scholar
  13. A. Kaklauskas, E. K. Zavadskas, and S. Raslanas, “Multivariant design and multiple criteria analysis of building refurbishments,” Energy and Buildings, vol. 37, no. 4, pp. 361–372, 2005. View at: Publisher Site | Google Scholar
  14. S. Ana, C. Sofia, M. Sebastian, and F. V. Jose, “Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization,” Reliability Engineering and System Safety, vol. 10, pp. 1–11, 2007. View at: Google Scholar
  15. S. Anish, K. Dinesh, and K. Pradeep, “Planning and optimizing the maintenance of paper production systems in a paper plant,” Computers and Industrial Engineering, vol. 10, pp. 1–13, 2008. View at: Google Scholar
  16. J. F. Villanueva, A. I. Sanchez, S. Carlos, and S. Martorell, “Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: a survey of strategies for harmonizing evolution and accuracy,” Reliability Engineering and System Safety, vol. 10, pp. 1–12, 2008. View at: Google Scholar
  17. E. K. Zavadskas and T. Vilutienė, “A multiple criteria evaluation of multi-family apartment block's maintenance contractors,” Building and Environment, vol. 41, no. 5, pp. 621–632, 2006. View at: Publisher Site | Google Scholar
  18. E. K. Zavadskas and T. Vilutienė, “Multicriteria evaluation of apartment blocks maintenance contractors: lithuanian case study,” International Journal of Strategic Property Management, vol. 13, no. 4, pp. 319–338, 2009. View at: Publisher Site | Google Scholar
  19. R. Pascual, V. Meruane, and P. A. Rey, “On the effect of downtime costs and budget constraint on preventive and replacement policies,” Reliability Engineering and System Safety, vol. 93, pp. 144–151, 2008. View at: Publisher Site | Google Scholar
  20. H. V. Water, “A maintenance model for quality management,” International Journal of Quality and Reliability Management, vol. 17, no. 7, pp. 756–770, 2000. View at: Google Scholar
  21. G. Mustafa, “Reliability of service systems and an application in student office,” International Journal of Quality and Reliability Management, vol. 1, pp. 58–66, 2002. View at: Google Scholar
  22. D. R. Cox and D. Oakes, Analysis of Survival Data, Chapman and Hall, New York, NY, USA, 1984.
  23. M. A. Islam, “Multistate survival models for transitions and reverse transitions: an application to contraceptive use data,” Journal of the Royal Statistical Society A, vol. 157, part 3, pp. 441–455, 1994. View at: Publisher Site | Google Scholar | Zentralblatt MATH | MathSciNet
  24. M. A. Burhanuddin, “Reliability analysis of delay in repair time using hazards model,” in Proceedings of the Integrating Technology in the Mathematical Sciences Conference, pp. 113–122, Universiti Sains Malaysia, part A, 2003. View at: Google Scholar
  25. M. Adamantios and W. Zhao, “Modeling and analysis of repairable systems with general repair,” in Proceedings of the IEEE Annual Reliability and Maintainability Symposium, no. 0-7803-8824-0, pp. 1–8, 2005. View at: Google Scholar
  26. A. W. Labib, “World-class maintenance using a computerised maintenance management system,” Journal of Quality in Maintenance Engineering, vol. 4, no. 1, pp. 66–75, 1998. View at: Publisher Site | Google Scholar
  27. M. Bevilacqua and M. Braglia, “The analytic hierarchy process applied to maintenance strategy selection,” Reliability Engineering and System Safety, vol. 70, no. 1, pp. 71–83, 2000. View at: Publisher Site | Google Scholar
  28. L. Swanson, “Computerized maintenance management systems: a study of system design and use,” Production and Inventory Management Journal, vol. 1, pp. 99–107, 1997. View at: Google Scholar
  29. J. B. Leger and G. Morel, “Integration of maintenance in the enterprise: towards an enterprise modelling-based framework compliant with proactive maintenance strategy,” Journal of Production Planning Control, vol. 1, part 2, pp. 341–352, 2001. View at: Publisher Site | Google Scholar
  30. L. Swanson, “Linking maintenance strategies to performance,” International Journal of Production Economics, vol. 70, no. 3, pp. 237–244, 2001. View at: Publisher Site | Google Scholar
  31. M. A. Burhanuddin, A. R. Ahmad, and M. I. Desa, “Maintenance decision making using multiple criteria analysis for small and medium industries,” Journal of Information Technology, vol. 19, no. 2, pp. 35–46, 2007. View at: Google Scholar
  32. E. E. Douglas and J. C. Winston, Discrete Mathematics: Mathematical Reasoning and Proof with Puzzles, Patterns and Games, John Wiley & Sons, New York, NY, USA, 2006.

Copyright © 2011 Burhanuddin M. A. et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.


More related articles

2623 Views | 2732 Downloads | 2 Citations
 PDF  Download Citation  Citation
 Download other formatsMore
 Order printed copiesOrder

Related articles

We are committed to sharing findings related to COVID-19 as quickly and safely as possible. Any author submitting a COVID-19 paper should notify us at help@hindawi.com to ensure their research is fast-tracked and made available on a preprint server as soon as possible. We will be providing unlimited waivers of publication charges for accepted articles related to COVID-19. Sign up here as a reviewer to help fast-track new submissions.