Table 5: The PSHPPIs actions in this experimental case study.

ActionCr01
(km2)
Cr02
(hm3)
Cr03
(m)
Cr04
(m3/s)
Cr05
(GWh)
Cr06
(GWh)
Cr07
(Million USD)
Cr09

A179473693261511,5Channel closed
rectangular 3.900 m

A2614838836317,8uPVC pipe 3.300 m

A33291311728163816,6Channel open
rectangular 9.600 m

A413013313510142924,1Tunnel modified horseshoe 8.800 m

A55537019719,5292327,9Tunnel circular
5.900 m

See and read [24] for square kilometer (km2), [25] for cubic hectometer (hm3), [26] for meter (m), [27] for cubic metre per second (m3/s), [28] for gigawatt hour (GWh), [29] for million, and [30] for USD; see, read, and watch [31] and see and read [32] for some issues about the conveyance structures.