Research Article
Estimation of Monetary Values of the Ecosystem Services Flow at the Tidal Elbe River
Table 1
Flood mitigation strategies involved for determination of better flood risk mitigation strategy.
| Strategy (scenarios) | Kilometers along the river | Area in hectares (ha) | Storage capacity in mio (m3) | Flood risk mitigation strategy |
| DS + 1 (dike heightening) | | | | Implementation of the design standard of a 100-year recurrence interval with an additional freeboard of 1 m for all dikes in Sachsen | DR I (dike shifting) | 117–536 | 34658 | 738 | dike relocation (uncontrolled operation) of 60 potential sites | DR II (dike shifting) | 120.5–536 | 9432 | 251 | Dike relocation (uncontrolled operation) of the 33 potential sites identified in the IKSE action plan | POL A (controlled retention) | 117–427 | 25 576 | 494 | Controlled operation of 31 potential sites for retention polders identified in the IKSE action plan | POL P (controlled retention) | 180 | 4557 | 138 | Controlled operation of only the largest 5 potential sites for retention identified in the IKSE action plan | POL H (controlled retention) | 427 | 9909 | 112 | Controlled operation of the 8 existing retention polders, at the mouth of the River Havel near Elbe |
|
|
Source: de Kok and Grossmann [16].
|