Research Article

Kaizen Selection for Continuous Improvement through VSM-Fuzzy-TOPSIS in Small-Scale Enterprises: An Indian Case Study

Table 2

Proposed KEs for identified gap areas/waste.

Identified gap area/wasteProposed KEs

Chattering/tool marks and difficulties in fastening of workpieceKE-1: training to operator/operator change
KE-2: fixture design change with snap fastening
KE-3: machine maintenance program for vibration reductions