Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates
Table 6
Break-down effect on jobs.
Jobs
2
5
1
Beak down
(30, 30, 30, 30, 30) to (33, 34, 35, 36, 37)
(17, 17, 17, 17, 17) to (30, 31, 32, 33, 34)
(34, 34, 34, 34, 34) to (46, 47, 48, 49, 50)
(37, 37, 37, 37, 37) to (44, 45, 46, 47, 48)
(34, 34, 34, 34, 34) to (35, 36, 37, 38, 39)
ā