Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates

Table 6

Break-down effect on jobs.

Jobs251

Beak down (30, 30, 30, 30, 30) to (33, 34, 35, 36, 37) (17, 17, 17, 17, 17) to (30, 31, 32, 33, 34) (34, 34, 34, 34, 34) to (46, 47, 48, 49, 50)
(37, 37, 37, 37, 37) to (44, 45, 46, 47, 48) (34, 34, 34, 34, 34) to (35, 36, 37, 38, 39)ā€”