Evaluation of an Improved Technique for Geosynthetic-Reinforced and Pile-Supported Embankment
Table 5
Change rates of the cost and efficiency.
| | FGT | Pile length-CT | Pile spacing-CT |
| Baseline case/(m) | — | 10.0 | 3.5 | Change case/(m) | — | 12.0 | 3.0 | Total cost | 2.6% | 18.9% | 14.0% | Maximum settlement | 10.1% | 9.7% | 7.6% | Lateral displacement | 18.8% | −0.5% | 0.8% | Maximum tension | −178.4% | −0.8% | −13.8% |
|
|