Research Article
A New Microstructure Development Model for the Evaluation of Concrete Setting Time
Table 3
Comparison of experimental and analytical results.
| Final setting time (hours) | Curing temperature (40°C) | Replacement of admixture (%) | Fly ash (w/c 0.47) | GGBFS (w/c 0.47) | Super plasticizer (w/c 0.37) | w/c 0.37 | w/c 0.47 | 10% | 20% | 30% | 50% | 0.375% | 0.75% |
| Experiment | 4.48 | 4.97 | 10.23 | 10.83 | 11.00 | 12.10 | 9.72 | 10.90 | Analysis | 4.80 | 5.28 | 10.08 | 11.04 | 10.56 | 11.76 | 9.12 | 10.08 | Error (%) | 7.14 | 6.24 | 1.47 | 1.94 | 4.00 | 2.81 | 6.17 | 7.52 |
|
|