Research Article

Effect of Rubberized Bitumen Blending Methods on Permanent Deformation of SMA Rubberized Asphalt Mixtures

Table 7

Three-stage models for control and rubberized asphalt mixtures at 200 kPa.

Temperature (°C)Asphalt mixture specimen Primary stage Secondary stageTertiary stage
ModelEnd pointPredicted strain, µsMeasured strain, µsModelSlopeEnd point (FN)Predicted strain, µsMeasured strain, µsModel

40°CControl = 2979.3N0.2628117319086.4819100.08 = 19086.48 + 4.422()4.422aaaa
TB = 2712.8N0.2343106313884.6413708.17 = 13884.64 + 2.173()2.173aaaa
CB = 2331.3N0.248686512523.9212222.56 = 12523.92 + 2.235()2.235aaaa

50°CControl = 2513.8N0.300447916051.0516116.79 = 16051.05 + 9.904()9.904aaaa
TB = 2828.6N0.272973517130.9517265.137 = 17130.95 + 5.733()5.733aaaa
CB = 2505.7N0.273770115059.2115183.12 = 15059.21 + 5.886()5.886aaaa

60°CControl = 3033.3N0.376917921429.6821786.87 = 21429.68 + 50.938()50.93874550260.5951394.74 = 50260.6 + 2159.8()
TB = 2479.8N0.344910912506.1912573.35 = 12506.19 + 31.592()31.59281334746.9636121.42 = 34747.0 + 2749.6()
CB = 2582.3N0.332128116796.6317038.48 = 16796.63 + 20.296()20.296141739852.8940954.44 = 39852.9 + 1474.2()

Not found at the end of 1800 cycles.