Research Article
Optimization of Life Cycle Extension of Asphalt Concrete Mixtures in regard to Material Properties, Structural Design, and Economic Implications
Table 5
Stress calculations before and after rehabilitation.
| Year | 5 | 10 | 15 | 20 | 25 | 30 | 35 | 40 |
| ACM layer thickness increase (mm) | 36 | 52 | 62 | 71 | — | — | — | — | AC 11-overlay (MPa) | 10891 | 10891 | 10891 | 10891 | 5445 | 5445 | 5445 | 5445 | AC 11 O (MPa) | 5945 | 5682 | 5551 | 5445 | 5354 | 5304 | 5248 | 5205 | AC 16 P (MPa) | 4540 | 4339 | 4239 | 4158 | 4088 | 4051 | 4008 | 3975 | Stress prior to rehabilitation (Mpa) | 0.751838 | 0.664456 | 0.620544 | 0.584984 | 0.48615 | 0.4465 | 0.42012 | 0.40146 | Stress prior to rehabilitation (Mpa) | 0.508571 | 0.464004 | 0.429907 | 0.40146 | 0.477312 | 0.428528 | 0.404145 | 0.382118 |
|
|