Research Article
Experiments on Hybrid Precast Concrete Shear Walls Emulating Monolithic Construction with Different Amounts of Posttensioned Strands and Different Debond Lengths of Grouted Reinforcements
Figure 7
Failure modes.
(a) MW |
(b) HPWEM1 |
(c) HPWEM2 |
(d) HPWEM3 |
(e) HPWEM4 |
(f) HPWEM5 |
(g) HPWEM6 |