Research Article
Experiments on Hybrid Precast Concrete Shear Walls Emulating Monolithic Construction with Different Amounts of Posttensioned Strands and Different Debond Lengths of Grouted Reinforcements
Table 5
The ultimate stress of the unbonded strands.
| |||||||||||||||||||||||||||||||||||||||||||||||||
Note. Analytical results were calculated based on the ABAQUS models. Error = (Measured − Analytical)/Measured × 100%. |