Research Article

Effect of High-Temperature Curing Methods on the Compressive Strength Development of Concrete Containing High Volumes of Ground Granulated Blast-Furnace Slag

Table 3

Steam curing methods.

Curing methodsDP, hoursTR, °C/hPT, °CPP, hoursTD, °C/h

Delay period (DP)2, 3, 41565410
Temperature rise (TR)310, 15, 2065410
Peak temperature (PT)31555, 65, 75410
Peak period (PP)315653, 4, 510
Temperature down (TP)3156545, 10, 15