Research Article
Reliability-Based Fatigue Life Prediction for Complex Structure with Time-Varying Surrogate Modeling
Table 5
The simulation time of the reliability-based fatigue life prediction of turbine blisk.
| Methods | Fitting surrogate models | Computing time of different simulation times, s | Sample number | Fitting time (s) | 102 | 103 | 104 | 105 |
| Direct simulation | — | — | 8.79 × 103 | 7.65 × 104 | 7.88 × 105 | — | RSM | 166 | 8.14 × 103 | 5.68 | 11.43 | 102.75 | 897.13 | GRNN | 115 | 6.73 × 103 | 2.42 | 6.53 | 17.47 | 76.18 | PSO-GRNN | 88 | 4.92 × 103 | 1.72 | 3.75 | 11.42 | 28.36 | TV/PSO-GRNN | 50 | 3.56 × 103 | 0.72 | 0.94 | 1.67 | 6.78 |
|
|