Research Article

Optimum Design and Performance of Porous Concrete for Heavy-Load Traffic Pavement in Cold and Heavy Rainfall Region of NE China

Table 7

Test results of specimen with 150 mm × 150 mm × 400 mm.

Goal porosity (%)Flexural tension experimentAntifreeze experiment
Curing period (d)Connected porosity (%)Curing period (d)Connected porosity (%)Connected porosity (%)

15717.32816.414.8
15.817.015.8
14.414.918.3
20723.32821.921.2
21.521.722.8
19.123.523.1
25726.12826.427.3
26.427.825.3
25.624.924.9
30730.62831.931.3
29.031.329.5
32.032.032.0