Research Article

Low-Temperature Performance and Evaluation Index of Gussasphalt for Steel Bridge Decks

Table 12

GA storage/mixing time requirements in cold regions.

Climatic conditions in winter (°C)−37∼−21.5
Colder area in winter
−21.5∼−9
Cold area in winter
>−9
Warm area in winter

Construction storage stirring time (≤)3 h4 h5.5 h