Research Article
Low-Temperature Performance and Evaluation Index of Gussasphalt for Steel Bridge Decks
Table 12
GA storage/mixing time requirements in cold regions.
| Climatic conditions in winter (°C) | −37∼−21.5 Colder area in winter | −21.5∼−9 Cold area in winter | >−9 Warm area in winter |
| Construction storage stirring time (≤) | 3 h | 4 h | 5.5 h |
|
|