Advances in Materials Science and Engineering / 2019 / Article / Fig 8

Research Article

Strengthening and Rehabilitation of U-Shaped RC Bridges Using Substitute Cable Ducts

Figure 8

An example of the anchorage areas made directly in the existing concrete of the main girders of U-shaped bridge. The strengthening was implemented in 2002, so the old type of anchors was used [21].

We are committed to sharing findings related to COVID-19 as quickly and safely as possible. Any author submitting a COVID-19 paper should notify us at help@hindawi.com to ensure their research is fast-tracked and made available on a preprint server as soon as possible. We will be providing unlimited waivers of publication charges for accepted articles related to COVID-19. Sign up here as a reviewer to help fast-track new submissions.