Research Article
A Case Study on the Control of Large Deformations in a Roadway Located in the Du’erping Coal Mine in China
Table 1
Parameters used in the ANSYS numerical model.
| ||||||||||||||||||||||||||||||||||||||||
Note: the shear transferring coefficient of the concrete element was 0.3 when opened and 1 when closed. |