Research Article

Reinforcement Effects of Isolation Piles on the Adjacent Existing Tunnel in Building Construction

Table 8

Deformation values of the tunnel structure.

Scheme numberMaximum horizontal displacement (mm)W after foundation pit excavation (mm)W after building loading (mm)

09.172.943.31
16.532.192.32
26.612.232.38
36.802.362.50

W is the horizontal displacement difference between the tunnel structure roof and the floor.