Research Article

Performance Research of Materials and Engineering Application of Overburden Strata Separation-Zone Grouting Technology

Table 7

The injection-production ratio table of each side of the second mining district.

T2191T2192T2193上T2193下T2194T2195Second mining district

Mining space (m3)1,601,228.51,185,036.61,093,955.31,044,856.01,118,089.01,066,103.97,109,269.4
Grout amount (m3)1,300,1391,152,1081,009,2521,223,7431,314,8131,132,7847,132,839
Cement take (m3)288,075257,113.6311,363.7323,597290,882.2250,4301,721,462
Injection ash ratio (%)1821.728.5312623.524.2
Grouting ratio (%)81.297.292.3117.1117.6106.3100.3