Research Article
Research on Dynamic Response of Shallow Buried Tunnel Lining Constructed by Drilling and Blasting Method
Figure 14
Polar coordinates of peak MISES stress in lining section. (a)–(e). (a) Peak MISES stress in section 1#. (b) Peak MISES stress in section 2#. (c) Peak MISES stress in section 3#. (d) Peak MISES stress in section 4#. (e) Peak MISES stress in section 5#.
(a) |
(b) |
(c) |
(d) |
(e) |