Research Article

Concurrent, Performance-Based Methodology for Increasing the Accuracy and Certainty of Short-Term Neural Prediction Systems

Table 12

Electric load consumption forecasting performances of different approaches.

MethodError type
MAERMSEMSEMAPEMaximal error

Single ANN34.4242.311789.9539.0093.45

Combined ANN
 Averaged30.6738.181457.4839.6673.15
 MAE weighted30.5538.051448.1339.5772.93
 RMSE weighted30.5338.001443.7538.4372.85
 MSE weighted29.7237.281389.5939.5272.49

Combined ANN-LIN.REG.
 MAE weighted35.4941.591729.4650.7887.10
 RMSE weighted35.8341.941759.1251.4287.45
 MSE weighted37.5843.491897.0654.2687.63

SARIMA28.2735.131234.1342.3885.18