Research Article

Smart Microgrid Energy Management Using a Novel Artificial Shark Optimization

Table 5

The constraints limit and bids of the DGs, utility, BES, and EVTs.

TypeMin. power (kW)Max. power (kW)Bid
(€ct/kWh)
OM (€ct/kWh)Start-up
(€ct)

MT6300.4570.04460.96
FC3300.2940.086181.65
FCEV3300.2940.086181.65
PV0252.5840.20820
WT0151.0730.52500
BES−30300.3800
BEV−30300.3800
PHEV−30300.3800
Grid−3030