Research Article

The Portfolio Balanced Risk Index Model and Analysis of Examples of Large-Scale Infrastructure Project

Table 10

The classification and portfolio risk index of the HZMB in initial construction stage.

Primary indexSecondary index Third-grade index
Risk nameIndexWeightRisk nameIndexWeight

Portfolio risk index of the HZMB in initial construction stage
PRI = 0.38
Technical risk0.360.212Risk of being poorly designed (R11)0.360.667
Innovation risk (R12)0.360.333
Economic risk0.410.137Risk of nontimely funding (R21)0.430.667
The risk of rising costs (R22)0.380.333
Social risk0.270.162The risk of regional system differences (R31)0.220.50
The public against risks (R32)0.310.50
Nature risk0.480.116Typhoon risk (R41)0.720.387
Earthquake risk (R42)0.310.412
Chloride salt corrosion risk (R43)0.360.201
Management risk0.440.265Schedule control risk (R51)0.310.227
Quality management risk (R52)0.480.538
Safety management risk (R53)0.460.235
Legal risk0.310.108Legal conflict or blind area risk (R61)0.311.00