Research Article
The Portfolio Balanced Risk Index Model and Analysis of Examples of Large-Scale Infrastructure Project
Table 7
Risk evaluation index system in construction stage.
| Primary index | Secondary index | Third-grade index |
| The CTR of the HZMB in construction stage | Technical risk (R1) | Risk of being poorly designed (R11) | Innovation risk (R12) | Economic risk (R2) | Risk of nontimely funding (R21) | The risk of rising costs (R22) | Social risk (R3) | The risk of regional system differences (R31) | The public against risks (R32) | Nature risk (R4) | Typhoon risk (R41) | Earthquake risk (R42) | Chloride salt corrosion risk (R43) | Management risk (R5) | Schedule control risk (R51) | Quality management risk (R52) | Safety management risk (R53) | Legal risk (R6) | Legal conflict or blind area risk (R61) |
|
|