Optimization results for wastewater treatment system.

Run#1#2#3#4#5#6#7#8#9#10

Cost
(k/yr)
373.1375.5377.6375.4383.1378.2377.7371.5377.2379.1

  
(k ton/d)
0.120.010.130.150.480.160.100.050.490.37
  
(k ton/d)
0.120.300.610.260.840.700.650.050.110.50
  
(k ton/d)
31.9532.3430.5531.6428.6730.0830.4832.3730.6730.01
  
(k ton/d)
9.9611.339.7510.389.689.409.679.959.979.75
  
(k ton/d)
7.817.358.717.9610.019.078.777.538.739.13
  
(cm/wk)
13.0713.0713.0713.0713.0713.0713.0713.0713.0713.07

  
(≥10)
10.0811.6310.3610.6410.5210.1010.3210.0010.0810.24
  
(≥0)
21.9921.0120.8021.2618.9920.6820.8122.4320.7020.26
  
(≤100 ha)
41.939.446.742.653.648.646.940.346.848.9
  
(≥170 kg/ha)
339.8339.8339.8339.8339.8339.8339.8339.8339.8339.8
  
(≤10 ppm)
9.999.999.999.999.999.999.999.999.999.99
  
(km)
16.7916.7516.9516.8317.1617.0016.9516.7516.9417.01
  
(≥5 ppm)
5.005.005.005.005.005.005.005.005.005.00