Research Article
Combined Use of Mathematical Optimization and Design of Experiments for the Maximization of Profit in a Four-Echelon Supply Chain
Table 7
Testing multiple ranges for costs.
(a) method: 95.0 percent LSD |
| Concept | Cases | Mean | Homogeneous groups |
| Financing | 55 | 1876.71 | X | Operation | 55 | 133492 | X | Delivery time | 55 | 138243 | X | Production | 55 | 180534 | X | Raw material | 55 | 203129 | X | Quality | 55 | 366922 | X | Transportation | 55 | 840106 | X |
|
|
(b) |
| Contrast | Sig. | Difference | +/− limits |
| Quality, financing | | 365045 | 39520.0 | Quality, raw material | | 163793 | 39520.0 | Quality, operation | | 233430 | 39520.0 | Quality, production | | 186388 | 39520.0 | Quality, delivery time | | 228679 | 39520.0 | Quality, transportation | | −473184 | 39520.0 | Financing, raw material | | −201252 | 39520.0 | Financing, operation | | −131616 | 39520.0 | Financing, production | | −178657 | 39520.0 | Financing, delivery time | | −136366 | 39520.0 | Financing, transportation | | −838230 | 39520.0 | Raw material, operation | | 69636.7 | 39520.0 | Raw material, production | | 22595.4 | 39520.0 | Raw material, delivery time | | 64886.1 | 39520.0 | Raw material, transportation | | −636977 | 39520.0 | Operation, production | | −47041.3 | 39520.0 | Operation, delivery time | | −4750.54 | 39520.0 | Operation, transportation | | −706614 | 39520.0 | Production, delivery time | | 42290.8 | 39520.0 | Production, transportation | | −659573 | 39520.0 | Delivery time, transportation | | −701863 | 39520.0 |
|
|
indicates a significant difference. |