Research Article

Research on Optimization of Big Data Construction Engineering Quality Management Based on RNN-LSTM

Table 2

Record error correction record.

Original recordError correction

The cement should be fed on demand; pay attention to the waterproof; the good processing has just covered to prevent the corrosion.The cement should be fed on demand; pay attention to the waterproof; the processed steel is covered to prevent the corrosion.
The length of the connecting beam of the steel bar anchored to the bottom of the two floors of the number 2 floor is insufficient.The length of the steel bar anchored to the connecting beam of the two stories suspended the beam of the number 2 building.
Dismantling the floor of the floor is not in place.The protection of the dismantling floor slab is not in place.
StirrupHorse stool
Silk mouthThread
Number 18 windowsill beam is not normally set.Number 18 window beam Weitong long set
25-layer ALC cutting quality did not meet the requirements.25-layer ALC block quality did not meet the requirements.