Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
Table 12
Planning decisions and the cost/benefit.
| Candidate i | Capi (m3 × 108) | Operational cost (RMB × 108) | Penalty cost (RMB × 108) | Benefit (RMB × 108) |
| 1 | 0.214 | 0.063 | 347.191 | 550.002 | 4 | 0.043 | 0.017 | 0 | 808.401 | 5 | 0.108 | 0.053 | 0 | 567.013 |
|
|