Research Article

Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 12

Planning decisions and the cost/benefit.

Candidate iCapi (m3 × 108)Operational cost (RMB × 108)Penalty cost (RMB × 108)Benefit (RMB × 108)

10.2140.063347.191550.002
40.0430.0170808.401
50.1080.0530567.013