Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties

Table 2

Decision variables.

Types of variablesSymbolDescription

The planning stagexi1 if hydropower station i is chosen, 0 otherwise
CapiThe maximum capacity of hydropower station candidate i

The operational stagesWater storage of candidate i at stage t under scenario s (m3)
Loss flow of candidate i at stage t under scenario s (m3/h)
Water discharge to downstream in candidate i at stage t under scenario s (m3/h)
Water discharge of power generation in candidate i at stage t under scenario s (m3/h)
Water spill in candidate i at stage t under scenario s (m3/h)