Comparative Simulation Analysis of the Performance of the Logistics Manufacturing System at the Operative Level

Table 11

Results of the combined manufacturing simulation process for , , and in case of 5000 simulation procedures.

ā€‰

Simulation no.273715232271
Total manufacturing time435643934504
Total replacement time157313841579
Lost flow capacity7,896,682,39
Total transportation time726732750
System state indicator0,440,500,47
System wear indicator0,930,920,91
System flexibility indicator0,640,680,65
Final flow capacity6472,285,5