Research Article

Investigation of Var Compensation Schemes in Unbalanced Distribution Systems

Figure 8

Three-phase voltage at Bus 9 before PV power integration with different upstream voltages: (a) highest upstream voltage (1.05 pu); (b) lowest upstream voltage (1.0 pu).
(a)
(b)