Research Article
Investigation of Var Compensation Schemes in Unbalanced Distribution Systems
Figure 8
Three-phase voltage at Bus 9 before PV power integration with different upstream voltages: (a) highest upstream voltage (1.05 pu); (b) lowest upstream voltage (1.0 pu).
(a) |
(b) |