Research Article

Dual-Source Optimization of the “Diverting Water from the Yangtze River to Tai Lake (DWYRTL)” Project Based on the Euler Method

Table 1

Model calculation evaluation.

MonitorYearRMSEMRE (%)R2

Xishan20170.0564.660.971
20180.0181.300.995
Dapu20170.0393.060.976
20180.1006.640.839
Taipu20170.0493.510.968
20180.0756.120.923
Wangting20170.0594.370.934
20180.0876.020.876