Research Article

Study on Multiobjective Modeling and Optimization of Offshore Micro Integrated Energy System considering Uncertainty of Load and Wind Power

Table 2

Parameters related to the gas well.

Number of gas well123

Location of gas well125
Minimum output of gas well/106 m30.10000.01130.0050
Maximum output of gas well/106 m30.13130.01580.0071
Minimum gas emission/106 m3000
Maximum gas emission/106 m30.10000.01130.0050
Cost coefficients of gas production $/106 m3201525
Penalty cost coefficients of gas emission $/106 m3200150250