| ā | RD mode | RD-RL-RD mode (container cannot be split) | RD-RL-RD mode | RD-RL mode |
| Economic cost | 1,070,569,856.88 (89.048%) | 877,506,777.12 (88.846%) | 858,378,971.54 (88.055%) | 824,511,370.74 (84.581%) | Time cost | 1,581,666.09 (0.132%) | 1,654,968.08 (0.168%) | 1,694,221.12 (0.174%) | 1,708,498.89 (0.175%) | Carbon emission cost | 130,081,090.81 (10.82%) | 48,046,932.06 (4.865%) | 30,779,220.61 (3.157%) | 28,135,157.24 (2.886%) | Construction and operation cost of dry port | ā | 60,458,811.66 (6.121%) | 83,970,571.75 (8.614%) | 87,329,394.62 (8.958%) |
|
|