Research Article

Optimal Control Strategy of Platform Load Oriented to Network and Load Cooperation

Table 16

Comparison of unit power generation cost after response scheduling in different scenarios.

ScenarioTotal cost of generationGross generationUnit generation cost

Scenario 173343027440.4326.73
Scenario 273335927419.2126.75
Scenario 375153927506.6427.32
Scenario 473192927593.0826.53