Research Article

A Fuzzy Optimization Model for High-Speed Railway Timetable Rescheduling

Table 2

Comparison of the optimal objectives.

Case
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9

Case  1 0.860180 0.860920 0.861390 0.862250 0.863920 0.864470 0.865731 0.865020 0.864170
Case  2 0.889860 0.890440 0.891050 0.892280 0.894240 0.896030 0.895490 0.892661 0.890040
Case  3 0.671015 0.674356 0.678921 0.684357 0.689117 0.693258 0.698091 0.702655 0.705186
Case  4 0.697540 0.698920 0.700130 0.702480 0.706060 0.709138 0.712240 0.714521 0.715390
Case  5 0.730050 0.732160 0.734875 0.737280 0.740856 0.744030 0.747980 0.749721 0.751060
Case  6 0.779810 0.781530 0.784010 0.787903 0.792877 0.797460 0.801130 0.804655 0.806515