Research Article
Fare Optimality Analysis of Urban Rail Transit under Various Objective Functions
Table 1
Baseline values for parameters.
| Symbol | Value | Unit | Symbol | Value | Unit |
| | 0.15 | — | | 210 | Passengers | | 4 | — | | 1.5 | — | | 0.49 | 1/h | | 25% | — | | 0.1 | 1/h | | 24% | — | | 0.05 | 1/h | | 0.8 | — | | 1.2 | 1/h | | 3800 | ¥/km | | 325 | ¥/h-veh | | 525 | ¥h | | 6 | Vehicle | | 4200 | ¥/km | | 1/120 | h | | 0.5 | ¥ | | 25 | min | | 2 | min | | 40 | km/h | | | |
|
|